Groundflag Start free

Job profit calculator

Type the contract price and what the job will really cost: materials, labor at its loaded cost, subs and other direct costs. The total cost, the gross profit, the margin and the markup update as you type. Your inputs stay in this browser. Usage measurement follows your cookie settings.

Total job cost
Gross profit
Margin on the job (%)
Markup on cost (%)

Track it for real: Groundflag's job costing puts every time card and bill on the job and shows the actual profit against the estimate while the job runs. Start 30 days free

What counts as job cost

Job cost is what this one job spends: materials, labor, subcontractors and other direct costs like permits, equipment rental and waste removal. Labor goes in at its loaded cost, the wage plus the burden on it, not the bare wage; the labor rate calculator works that number out.

Company overhead, the office, insurance and trucks that serve every job, stays out of this number. Each job's price still has to cover its share of overhead on top of its own cost: a margin that ignores overhead is not the margin the business keeps.

Formulas

Total cost = materials + labor + subs + other. Gross profit = contract price - total cost. Margin = profit / price. Markup = profit / total cost.

With the example numbers on this page, a $25,000 job that costs $22,000 leaves $3,000: a 12% margin and a 13.6% markup. The same profit reads as a bigger markup than margin, because margin is measured on the price and markup on the cost.

The same profit in Groundflag

Groundflag's job costing keeps the estimate's committed cost next to what the job actually spends. Time cards price labor at the price book's loaded rate and vendor bills land on the job's cost codes, so the profit on this page is a number the job report shows while the job runs, not after it ends.

Questions

How do I calculate profit on a construction job?

Add every direct cost of the job, materials, labor at loaded cost, subs and other costs, and subtract the total from the contract price. Divide the result by the price for the margin or by the cost for the markup.

What is a good profit margin for a contractor?

There is no single number that fits every trade and market. What this page gives you is your own margin per job, computed from your costs; whether it is enough depends on the overhead and the risk your company carries.

Should job cost include overhead?

No. Overhead belongs to the company, not to one job: it is recovered across all the work you sell in the year. Keep it out of the job cost and make sure the year's margins cover it.

Is labor cost the wage or the loaded cost?

Loaded cost. A $20 wage costs more than $20 once payroll taxes, workers' comp and benefits sit on top of it. The labor rate calculator computes the loaded cost per field hour.

Keep reading

Questions? Write to hello@groundflag.com